ALKUMRU-SİİRT E.İ.H.
Siirt · 154 kV · Build
The Armin–Özaş Joint Venture, in which ÖZAŞ holds a 49 per cent stake, carried out the construction works for 154 kV double-circuit power transmission lines in Siirt for Limak Hydroelectric Power Plant Investments Inc. The project involved the construction of power transmission lines featuring galvanised steel lattice towers, MCM conductors and OPGW protective conductors along the Alkumru HES–Siirt Çim and Alkumru HES–Siirt routes.
154kV
500Km
112Period
Siirt · 154 kV · Enerji İletim Hattı
Construction of 154 kV double-circuit power transmission lines; installation of galvanised steel lattice pylons, and installation of conductors and OPGW protective conductors. The ‘construction technique applied’ section of the document also describes this as the construction of 60+446.54 km of power transmission lines comprising 1,272 MCM and OPGW protective conductors.
Siirt